Accessibility Renovations

Accessibility Renovations in Ontario

Good accessibility work should look like good design, not medical equipment. We scope accessibility renovations around how you actually move through the house: 36-inch doorways, clear turning radii in kitchens and bathrooms, curbless showers, lever handles instead of knobs, and lighting that makes edges and level changes easy to read. Done properly, none of it announces itself β€” a visitor sees a well-built home, while the person living there gains room to move safely.

The most cost-effective decisions happen inside the walls. While a bathroom or hallway is open, we install solid blocking behind the finished surfaces so grab bars and fold-down seats can be added later without tearing anything apart. We plan switch and outlet heights for reach from a seated position, choose slip-resistant flooring that still suits the rest of the house, and keep thresholds flush between rooms. Federal and provincial programs, including the multigenerational home renovation credit and home accessibility credits, may apply to this work β€” your accountant confirms eligibility for your situation.

What this covers

  • In-home assessment of doorways, hallways, thresholds and turning space
  • Doorway widening to 36 inches with new framing, doors and casing
  • Curbless shower conversion with linear drain and sloped waterproofed floor
  • Blocking installed behind walls for current or future grab bars and seats
  • Lever door handles, lever faucets and rocker light switches throughout
  • Task and pathway lighting upgrades wired by a Licensed Electrical Contractor
  • Slip-resistant flooring with flush transitions between rooms
  • Ramps, handrails and exterior approach work where the entry needs it

What affects the price

  • How many doorways and hallways need widening, and whether any walls involved are load-bearing
  • Bathroom scope β€” a full curbless conversion moves drains and rebuilds the floor structure
  • Whether the existing subfloor and joists allow a flush shower entry or need recessing
  • Electrical scope for lighting, switch relocation and any future-ready wiring
  • Age of the home β€” older houses often hide framing and plumbing surprises once opened
  • Finish level: accessible fixtures span a wide range from standard to design-grade

Every home is different, so we don’t publish flat prices β€” the quote is free and based on your actual job.

Common questions

Will the renovation make my house look institutional?
No β€” that outcome is a design failure, not a requirement. Curbless showers, wider doorways, lever hardware and layered lighting are all standard features in high-end builds. We select fixtures and finishes that match the rest of your home, and we hide the purpose-built elements, like grab-bar blocking, inside the walls where nobody sees them.
Are there tax credits for accessibility renovations in Ontario?
Potentially, yes. Federal programs such as the home accessibility tax credit and the multigenerational home renovation credit can apply to qualifying work, and eligibility depends on who lives in the home and what the renovation includes. We provide detailed invoices that separate eligible scope, and your accountant confirms what applies to your return.
Should we install grab bars now or just prepare for them?
We recommend installing blocking behind the wall in every likely location while it is open β€” it costs little during construction and nothing shows afterward. Then install actual grab bars only where they are needed today. When needs change, new bars anchor into solid wood in minutes instead of requiring a wall rebuild.
Do accessibility renovations need a building permit?
It depends on scope. Moving plumbing for a curbless shower, altering structure to widen openings in bearing walls, or adding a ramp with significant height generally requires a permit. Swapping hardware, lighting and flooring usually does not. We confirm requirements with your municipality and handle the permit package when one is needed.

Ready to sort out your accessibility renovations?

Tell us what you're planning β€” one room or the whole home β€” and get a free quote.