Cabinet installation looks simple from the outside β€” boxes on a wall β€” and is anything but. Floors and walls in most Ontario homes are neither level nor plumb, so installers shim, scribe and level every run to a laser line before a single screw goes into a stud. Uppers must be anchored to carry real weight, fillers cut to close gaps against uneven walls, and doors and drawers aligned so the reveals read straight down the whole kitchen.

The install is also the hinge point of the wider schedule. Countertop fabricators will not template until base cabinets are set and level, and the backsplash cannot start until counters are on. Getting the cabinet stage right β€” correct order of runs, appliance openings verified against the actual appliances, plumbing and electrical rough-ins landing inside the right boxes β€” keeps everything after it on time. A crew that installs cabinets weekly will finish in days what a general labourer fights for a week.

What this covers

  • Removal and disposal of existing cabinets where needed
  • Layout marking, stud location and level lines for every run
  • Setting and securing base and upper cabinets, shimmed level and plumb
  • Filler panels, toe kicks, end panels and crown detail scribed to the walls
  • Cutouts for sinks, plumbing, outlets and appliances
  • Door and drawer alignment and hardware installation
  • Coordination with countertop templating once bases are set

What affects the price

  • Number of cabinets and how many separate runs and corners the layout has
  • Assembled cabinets versus flat-pack units that need building on site
  • How far the existing walls and floor are out of level, which drives scribing time
  • Islands and tall pantry units, which take more anchoring and panel work
  • Crown moulding, light valances and other finish details
  • Whether old cabinets need removal and disposal first

Every home is different, so we don’t publish flat prices β€” the quote is free and based on your actual job.

Common questions

Should cabinets go in before or after flooring?
Both approaches are used. Running flooring under the cabinets costs more material but lets you change cabinet layout later and avoids height problems at dishwashers, which must be able to slide out over the finished floor. Installing cabinets first and flooring up to the toe kick saves material. For floating floors, cabinets should never pin the planks β€” the floor needs room to move, so cabinets-first is standard there.
Can new cabinets go on my existing kitchen layout?
Yes, and it is the most economical route: the plumbing, wiring and venting all stay where they are, so no permits or trade rough-ins are usually needed. The installer maps the new cabinet sizes onto the old footprint, adjusting fillers to suit. If you want an outlet added inside an island or a new run, that piece goes to a Licensed Electrical Contractor.
How long does cabinet installation take?
A typical kitchen of fifteen to twenty-five cabinets takes an experienced two-person crew two to four days once the room is ready β€” longer if units arrive flat-packed and need assembly, or if walls are badly out of plumb. Add the countertop wait after that: templating happens once bases are level and secured, and fabrication usually takes one to two weeks before counters return for installation.