Renovating an entire house is a sequencing problem before it is a design problem. The order rarely changes: structure first, then the mechanical systems β€” wiring, plumbing, heating and cooling β€” then insulation and drywall, then floors, kitchens, bathrooms and trim. Work done out of order gets redone. A whole-home project run well feels like one continuous build; run badly, it becomes a series of trades undoing each other's work. That is why the contractor's scheduling ability matters as much as the quality of any single trade.

Ontario whole-home projects almost always involve permits. Structural changes, new plumbing runs and rewiring are all permit-and-inspection work under the Ontario Building Code, with wiring by a Licensed Electrical Contractor and plumbing by licensed plumbers. Budget honestly for the unknown: once walls open, older houses reveal surprises, and a contingency reserve is the difference between a decision and a crisis. Comparable quotes need a fixed scope document β€” drawings, finish schedule and allowances β€” that every bidder prices identically.

What this covers

  • Scope development and design, from layout drawings through a written finish schedule
  • Permit drawings, applications and coordination of staged municipal inspections
  • Structural work such as beam installation and wall removal, built from engineered drawings
  • Full electrical rewiring or upgrades by a Licensed Electrical Contractor
  • Plumbing replacement and new runs by licensed plumbers, including bathroom and kitchen groups
  • Heating and cooling changes, insulation and air-sealing brought up to current standards
  • Drywall, flooring, kitchens, bathrooms, doors, trim and paint through to completion
  • Project management: scheduling of trades, inspections, deliveries and change decisions

What affects the price

  • How much of the house is touched β€” a true whole-home scope prices differently from three big rooms
  • Structural ambition, since every removed wall adds engineering, permits and steel or engineered lumber
  • Age and condition of wiring, plumbing and ductwork, which decide replacement versus reuse
  • Kitchen and bathroom count, the densest and costliest spaces per square metre
  • Finish tier across flooring, cabinetry, tile and millwork
  • Whether you live in the house during construction, which stretches schedules and adds phasing
  • Contingency needs, higher in older homes where more sits hidden behind plaster and panelling

Every home is different, so we don’t publish flat prices β€” the quote is free and based on your actual job.

Common questions

Should we move out during a whole-home renovation?
If the scope touches the kitchen, the only bathroom, or the mechanical systems for extended stretches, moving out usually saves money overall. Contractors work faster in an empty house, phasing costs evaporate, and dust and noise stop ruling your life. Staying put suits projects that can be split into halves with a functioning kitchen and bathroom on the live side.
How much contingency should the budget carry?
A common practice is holding roughly ten to twenty percent of construction cost in reserve, higher for older houses. The reserve covers what design cannot see: rot at a leaky window, improvised past wiring, drains run the wrong way. Treat it as insurance, not spending money β€” if it survives to the end, it buys upgrades or stays in your pocket.
Why does the order of work matter so much?
Because each stage closes access to the one before it. Drains and wiring must be finished and inspected before insulation, insulation before drywall, drywall before cabinets, cabinets before countertops. Reversing any pair means demolition of new work. Good contractors also front-load long-lead orders β€” windows, cabinetry, engineered beams β€” so the site never stalls waiting on a delivery.
One contractor or separate trades we hire ourselves?
For a whole-home scope, a single general contractor or design-build firm earns their management fee. Coordinating a dozen trades, inspections and deliveries is a full-time job, and when something goes wrong, one party owns the fix. Self-managing suits experienced owners with flexible schedules and a tolerance for being the person every trade calls first.